← Open interactive workspace

CARE EXPANSION INTELLIGENCE / SEPAHI GROUP

My Fire Door

Prioritise defined door surveys and repair-or-replace decisions in Dorset, Hampshire and London. My Fire Door’s willingness to take work from individual doors to larger schemes makes small operational scopes useful alongside contractor-led packages. Wider compartmentation should be specified separately.

Research edition: 28 September 2026. Contract availability is unconfirmed. This text view includes the published research; working notes remain in the interactive workspace on your device.

Service territory

Dorset, Hampshire and London

Work to prioritise

Fire-door inspections, practical repairs and complete door/frame installation, with related wall, floor, ceiling or penetration surveys where the client has an identified need.

Start here · Acquired

The Grange Nursing Home

Serincourt Limited trading as Numada Healthcare · Sherborne St John, Hampshire

Programme: Confirm current timetable
Source checked: 2026-09-28

Target scope

Offer a bounded review of existing door information and any consented-extension interface, if the new owner requests it.

Why it fits

The Grange’s September sale announcement identifies an existing 26-bedroom home with consent for 14 additional bedrooms. My Fire Door’s stated range from individual doors to larger schemes makes a proportionate first commission possible.

Recommended first move

Use admin@numadahealthcare.co.uk (Numada Healthcare) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Can the latest door survey be used to identify a small repair scope before considering replacement or extension-related work?

Timing

The September transaction is recent, but the 14-bedroom consent is not a construction programme. Separate existing-home support from any future extension and establish which, if either, the operator is considering.

Qualification questions

Prepare before contact

Reasons to stop

Published buyer routes

Numada Healthcare · Zahid Datoo

Managing Director, Serincourt Limited trading as Numada Healthcare
Request Zahid Datoo's team for existing-home maintenance and the programme for the consented 14-room extension.

admin@numadahealthcare.co.uk

02392 510344

Verify this contact on its source
The Grange Nursing Home

Home team
Confirm who owns maintenance decisions at the acquired home and whether the extension has entered delivery.

01256 851191

Verify this contact on its source
Christie & Co · Charles Phillips

Transaction adviser
Request an introduction to the current owner or project team; the adviser is not the procurement buyer.

charles.phillips@christie.com

+44 7764 241346

Verify this contact on its source

Supplier introduction draft

Review the sender details and selected recipient before sending.

Subject: The Grange Nursing Home: fire-door survey and package responsibilities

Hello Numada Healthcare team,

The Grange’s September sale announcement identifies an existing 26-bedroom home with consent for 14 additional bedrooms. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.

Can the latest door survey be used to identify a small repair scope before considering replacement or extension-related work?

Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.

Kind regards,
My Fire Door
contact@myfiredoor.co.uk

Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.

Next useful trigger

Serincourt/Numada confirms an extension design appointment, construction programme or existing-home review.

Original evidence

Worth qualifying · Construction

Wenham Holt / Liss care home

Barchester Healthcare · Liss, Hampshire

Programme: 2028
Source checked: 2026-09-28

Target scope

Identify the new home’s complete doorset specification and installation responsibility through Kori.

Why it fits

Kori’s September announcement confirms work on Barchester’s 64-bedroom Liss home, with completion expected during 2028. The combined survey, repair and installation offer can be positioned against the actual package boundary rather than a generic door count.

Recommended first move

Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Are doorset supply, frame fitting and post-installation inspection bought together at Liss or as separate appointments?

Timing

The September construction announcement provides a named project route and a 2028 horizon. Package and consultancy appointments may already be committed; identify the exact buyer and next decision before estimating.

Qualification questions

Prepare before contact

Reasons to stop

Published buyer routes

Kori Construction

Project commercial / procurement team
Confirm who controls the relevant trade package, its specification and whether specialist introductions are being considered.

works@koriconstruction.com

01536 744402

Verify this contact on its source
Barchester Healthcare

Head office; request property / estates procurement
Ask who controls operator standards and ongoing fire, nurse-call or maintenance support for this home.

0203 131 4636

Verify this contact on its source

Supplier introduction draft

Review the sender details and selected recipient before sending.

Subject: Wenham Holt / Liss care home: fire-door survey and package responsibilities

Hello Kori Construction team,

Kori’s September announcement confirms work on Barchester’s 64-bedroom Liss home, with completion expected during 2028. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.

Are doorset supply, frame fitting and post-installation inspection bought together at Liss or as separate appointments?

Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.

Kind regards,
My Fire Door
contact@myfiredoor.co.uk

Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.

Next useful trigger

The named package or consultancy buyer confirms an onboarding window, information issue or handover appointment.

Original evidence

Worth qualifying · Construction

Whitford Gardens care home

Care UK · Mitcham, Greater London

Programme: Spring 2028
Source checked: 2026-09-28

Target scope

Ask the named Whitford Gardens commercial route about door-package status and any separately procured inspection role.

Why it fits

Kori reports work underway on Care UK’s 64-bed Whitford Gardens home in Mitcham, with a spring 2028 target. Survey capability gives a distinct question even where supply and fitting are already assigned, without assuming supplementary work exists.

Recommended first move

Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Does the Whitford Gardens door package include final inspection and documentation, and who accepts that evidence for Care UK?

Timing

The August work-start announcement and spring 2028 target justify a project-team introduction. Neither proves open packages; ask where the proposed scope sits in the existing appointment structure.

Qualification questions

Prepare before contact

Reasons to stop

Published buyer routes

Kori Construction · Jack Stevenson

Senior Quantity Surveyor
Confirm who controls the relevant trade package, its specification and whether specialist introductions are being considered.

works@koriconstruction.com

01536 744402

Verify this contact on its source
Care UK · Jake Higgins

Development Project Manager
Confirm the operator specification, handover responsibilities and future servicing buyer.

0330 165 1330

Verify this contact on its source

Supplier introduction draft

Review the sender details and selected recipient before sending.

Subject: Whitford Gardens care home: fire-door survey and package responsibilities

Hello Kori Construction team,

Kori reports work underway on Care UK’s 64-bed Whitford Gardens home in Mitcham, with a spring 2028 target. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.

Does the Whitford Gardens door package include final inspection and documentation, and who accepts that evidence for Care UK?

Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.

Kind regards,
My Fire Door
contact@myfiredoor.co.uk

Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.

Next useful trigger

Kori or Care UK identifies a relevant appointment, information issue or operational handover decision.

Original evidence

Worth qualifying · Construction

Manor Road care home

Hallmark Luxury Care Homes · Redbridge, Greater London

Programme: Late 2028
Source checked: 2026-09-28

Target scope

Qualify door and adjacent-compartmentation responsibilities at Hallmark’s 110-bed Manor Road project.

Why it fits

Kori reports works started on Hallmark’s 110-bed Manor Road home in Redbridge, with late 2028 completion targeted. My Fire Door’s wider compartmentation offer can address interfaces if the main contractor has a defined need for that scope.

Recommended first move

Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Who coordinates the door schedule with walls, service penetrations and room-use changes during design development?

Timing

Late 2028 is a long delivery horizon. Use the current construction route to establish responsibilities; avoid treating it as an imminent operational service order.

Qualification questions

Prepare before contact

Reasons to stop

Published buyer routes

Kori Construction

Project commercial / procurement team
Confirm who controls the relevant trade package, its specification and whether specialist introductions are being considered.

works@koriconstruction.com

01536 744402

Verify this contact on its source
Hallmark Luxury Care Homes · Rob Needham

Development Director
Route operator specification and future maintenance enquiries to Hallmark's property team.

Verify this contact on its source

Supplier introduction draft

Review the sender details and selected recipient before sending.

Subject: Manor Road care home: fire-door survey and package responsibilities

Hello Kori Construction team,

Kori reports works started on Hallmark’s 110-bed Manor Road home in Redbridge, with late 2028 completion targeted. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.

Who coordinates the door schedule with walls, service penetrations and room-use changes during design development?

Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.

Kind regards,
My Fire Door
contact@myfiredoor.co.uk

Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.

Next useful trigger

A named technical buyer, defined package milestone or scheduled Hallmark operational-procurement decision.

Original evidence

Worth qualifying · Contractor appointed

The Langford

Cinnamon Care Collection · Hampton, Greater London

Programme: End of 2027 completion
Source checked: 2026-09-28

Target scope

Establish the current programme and any door-survey or installation role associated with the retained-facade care development.

Why it fits

Cinnamon’s current page retains an end-2027 target for The Langford, with Kori appointed to the retained-facade development. Survey and practical repair capability may be relevant to retained fabric, but the design team must first confirm what is actually being retained.

Recommended first move

Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Does the retained-facade design create separately specified existing-to-new door or compartment interfaces, and who is responsible for them?

Timing

The end-2027 target remains published, but the earlier contractor appointment is not a fresh site-progress report. Confirm the physical programme before committing survey or estimating resources.

Qualification questions

Prepare before contact

Reasons to stop

Published buyer routes

Kori Construction

Contractor: ask for project commercial or procurement lead
Confirm who controls the relevant trade package, its specification and whether specialist introductions are being considered.

works@koriconstruction.com

01536 744402

Verify this contact on its source
Cinnamon Care Collection

Head office; request development / estates team
Confirm operator handover, specified care technology and the maintenance procurement route.

01784 772 770

Verify this contact on its source

Supplier introduction draft

Review the sender details and selected recipient before sending.

Subject: The Langford: fire-door survey and package responsibilities

Hello Kori Construction team,

Cinnamon’s current page retains an end-2027 target for The Langford, with Kori appointed to the retained-facade development. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.

Does the retained-facade design create separately specified existing-to-new door or compartment interfaces, and who is responsible for them?

Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.

Kind regards,
My Fire Door
contact@myfiredoor.co.uk

Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.

Next useful trigger

A verified construction milestone, updated drawings or an operator-agreed pre-opening assessment window.

Original evidence