Prioritise defined door surveys and repair-or-replace decisions in Dorset, Hampshire and London. My Fire Door’s willingness to take work from individual doors to larger schemes makes small operational scopes useful alongside contractor-led packages. Wider compartmentation should be specified separately.
Research edition: 28 September 2026. Contract availability is unconfirmed. This text view includes the published research; working notes remain in the interactive workspace on your device.
Service territory
Dorset, Hampshire and London
Work to prioritise
Fire-door inspections, practical repairs and complete door/frame installation, with related wall, floor, ceiling or penetration surveys where the client has an identified need.
Start here · Acquired
The Grange Nursing Home
Serincourt Limited trading as Numada Healthcare · Sherborne St John, Hampshire
Programme: Confirm current timetable Source checked: 2026-09-28
Target scope
Offer a bounded review of existing door information and any consented-extension interface, if the new owner requests it.
Why it fits
The Grange’s September sale announcement identifies an existing 26-bedroom home with consent for 14 additional bedrooms. My Fire Door’s stated range from individual doors to larger schemes makes a proportionate first commission possible.
Recommended first move
Use admin@numadahealthcare.co.uk (Numada Healthcare) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Can the latest door survey be used to identify a small repair scope before considering replacement or extension-related work?
Timing
The September transaction is recent, but the 14-bedroom consent is not a construction programme. Separate existing-home support from any future extension and establish which, if either, the operator is considering.
Qualification questions
Can the latest door survey be used to identify a small repair scope before considering replacement or extension-related work?
Does the requested work concern adjustment, repair or a complete replacement assembly, and who approves that decision?
What is the next agreed review or renewal date, and is there a current need beyond the existing provider’s contract?
Prepare before contact
Prepare a survey-led enquiry checklist and examples of the information needed to distinguish adjustment, repair and replacement.
Prepare a survey-led quotation checklist distinguishing individual-door work, complete assemblies and adjacent compartmentation.
Check the linked project source and current public route before sending; the published starting point is admin@numadahealthcare.co.uk (Numada Healthcare).
Reasons to stop
No current survey, requested inspection or confirmed extension scope supports a commercial discussion.
No current review, renewal or defined change exists beyond the public opening or ownership announcement.
Published buyer routes
Numada Healthcare · Zahid Datoo
Managing Director, Serincourt Limited trading as Numada Healthcare Request Zahid Datoo's team for existing-home maintenance and the programme for the consented 14-room extension.
Review the sender details and selected recipient before sending.
Subject: The Grange Nursing Home: fire-door survey and package responsibilities
Hello Numada Healthcare team,
The Grange’s September sale announcement identifies an existing 26-bedroom home with consent for 14 additional bedrooms. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.
Can the latest door survey be used to identify a small repair scope before considering replacement or extension-related work?
Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.
Kind regards,
My Fire Door
contact@myfiredoor.co.uk
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next useful trigger
Serincourt/Numada confirms an extension design appointment, construction programme or existing-home review.
Identify the new home’s complete doorset specification and installation responsibility through Kori.
Why it fits
Kori’s September announcement confirms work on Barchester’s 64-bedroom Liss home, with completion expected during 2028. The combined survey, repair and installation offer can be positioned against the actual package boundary rather than a generic door count.
Recommended first move
Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Are doorset supply, frame fitting and post-installation inspection bought together at Liss or as separate appointments?
Timing
The September construction announcement provides a named project route and a 2028 horizon. Package and consultancy appointments may already be committed; identify the exact buyer and next decision before estimating.
Qualification questions
Are doorset supply, frame fitting and post-installation inspection bought together at Liss or as separate appointments?
Does the requested work concern adjustment, repair or a complete replacement assembly, and who approves that decision?
Who can appoint this particular scope, what is already committed, and what is the next decision date?
Prepare before contact
Prepare a responsibility sheet covering complete assemblies, installation tolerances, hardware and acceptance records.
Prepare a survey-led quotation checklist distinguishing individual-door work, complete assemblies and adjacent compartmentation.
Check the linked project source and current public route before sending; the published starting point is works@koriconstruction.com (Kori Construction).
Reasons to stop
The buyer requires a manufacturing capability or certification scope that has not been confirmed for My Fire Door.
The buyer cannot identify an authorised appointment or provide enough information to define and price the requested scope.
Published buyer routes
Kori Construction
Project commercial / procurement team Confirm who controls the relevant trade package, its specification and whether specialist introductions are being considered.
Head office; request property / estates procurement Ask who controls operator standards and ongoing fire, nurse-call or maintenance support for this home.
Review the sender details and selected recipient before sending.
Subject: Wenham Holt / Liss care home: fire-door survey and package responsibilities
Hello Kori Construction team,
Kori’s September announcement confirms work on Barchester’s 64-bedroom Liss home, with completion expected during 2028. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.
Are doorset supply, frame fitting and post-installation inspection bought together at Liss or as separate appointments?
Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.
Kind regards,
My Fire Door
contact@myfiredoor.co.uk
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next useful trigger
The named package or consultancy buyer confirms an onboarding window, information issue or handover appointment.
Ask the named Whitford Gardens commercial route about door-package status and any separately procured inspection role.
Why it fits
Kori reports work underway on Care UK’s 64-bed Whitford Gardens home in Mitcham, with a spring 2028 target. Survey capability gives a distinct question even where supply and fitting are already assigned, without assuming supplementary work exists.
Recommended first move
Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Does the Whitford Gardens door package include final inspection and documentation, and who accepts that evidence for Care UK?
Timing
The August work-start announcement and spring 2028 target justify a project-team introduction. Neither proves open packages; ask where the proposed scope sits in the existing appointment structure.
Qualification questions
Does the Whitford Gardens door package include final inspection and documentation, and who accepts that evidence for Care UK?
Does the requested work concern adjustment, repair or a complete replacement assembly, and who approves that decision?
Who can appoint this particular scope, what is already committed, and what is the next decision date?
Prepare before contact
Prepare a short inspection-scope example with independence and evidence boundaries clearly stated.
Prepare a survey-led quotation checklist distinguishing individual-door work, complete assemblies and adjacent compartmentation.
Check the linked project source and current public route before sending; the published starting point is works@koriconstruction.com (Kori Construction).
Reasons to stop
The project requires independent acceptance of the supplier’s own installation without an agreed separation of roles.
The buyer cannot identify an authorised appointment or provide enough information to define and price the requested scope.
Published buyer routes
Kori Construction · Jack Stevenson
Senior Quantity Surveyor Confirm who controls the relevant trade package, its specification and whether specialist introductions are being considered.
Review the sender details and selected recipient before sending.
Subject: Whitford Gardens care home: fire-door survey and package responsibilities
Hello Kori Construction team,
Kori reports work underway on Care UK’s 64-bed Whitford Gardens home in Mitcham, with a spring 2028 target. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.
Does the Whitford Gardens door package include final inspection and documentation, and who accepts that evidence for Care UK?
Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.
Kind regards,
My Fire Door
contact@myfiredoor.co.uk
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next useful trigger
Kori or Care UK identifies a relevant appointment, information issue or operational handover decision.
Hallmark Luxury Care Homes · Redbridge, Greater London
Programme: Late 2028 Source checked: 2026-09-28
Target scope
Qualify door and adjacent-compartmentation responsibilities at Hallmark’s 110-bed Manor Road project.
Why it fits
Kori reports works started on Hallmark’s 110-bed Manor Road home in Redbridge, with late 2028 completion targeted. My Fire Door’s wider compartmentation offer can address interfaces if the main contractor has a defined need for that scope.
Recommended first move
Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Who coordinates the door schedule with walls, service penetrations and room-use changes during design development?
Timing
Late 2028 is a long delivery horizon. Use the current construction route to establish responsibilities; avoid treating it as an imminent operational service order.
Qualification questions
Who coordinates the door schedule with walls, service penetrations and room-use changes during design development?
Does the requested work concern adjustment, repair or a complete replacement assembly, and who approves that decision?
Who can appoint this particular scope, what is already committed, and what is the next decision date?
Prepare before contact
Prepare a coordination checklist rather than a quote based solely on the published bed count.
Prepare a survey-led quotation checklist distinguishing individual-door work, complete assemblies and adjacent compartmentation.
Check the linked project source and current public route before sending; the published starting point is works@koriconstruction.com (Kori Construction).
Reasons to stop
The only information available is the headline capacity and the buyer cannot provide a specification or appointment route.
The buyer cannot identify an authorised appointment or provide enough information to define and price the requested scope.
Published buyer routes
Kori Construction
Project commercial / procurement team Confirm who controls the relevant trade package, its specification and whether specialist introductions are being considered.
Review the sender details and selected recipient before sending.
Subject: Manor Road care home: fire-door survey and package responsibilities
Hello Kori Construction team,
Kori reports works started on Hallmark’s 110-bed Manor Road home in Redbridge, with late 2028 completion targeted. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.
Who coordinates the door schedule with walls, service penetrations and room-use changes during design development?
Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.
Kind regards,
My Fire Door
contact@myfiredoor.co.uk
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next useful trigger
A named technical buyer, defined package milestone or scheduled Hallmark operational-procurement decision.
Cinnamon Care Collection · Hampton, Greater London
Programme: End of 2027 completion Source checked: 2026-09-28
Target scope
Establish the current programme and any door-survey or installation role associated with the retained-facade care development.
Why it fits
Cinnamon’s current page retains an end-2027 target for The Langford, with Kori appointed to the retained-facade development. Survey and practical repair capability may be relevant to retained fabric, but the design team must first confirm what is actually being retained.
Recommended first move
Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Does the retained-facade design create separately specified existing-to-new door or compartment interfaces, and who is responsible for them?
Timing
The end-2027 target remains published, but the earlier contractor appointment is not a fresh site-progress report. Confirm the physical programme before committing survey or estimating resources.
Qualification questions
Does the retained-facade design create separately specified existing-to-new door or compartment interfaces, and who is responsible for them?
Does the requested work concern adjustment, repair or a complete replacement assembly, and who approves that decision?
Who can appoint this particular scope, what is already committed, and what is the next decision date?
Prepare before contact
Request current drawings and a retained-elements schedule before offering a site survey or repair proposal.
Prepare a survey-led quotation checklist distinguishing individual-door work, complete assemblies and adjacent compartmentation.
Check the linked project source and current public route before sending; the published starting point is works@koriconstruction.com (Kori Construction).
Reasons to stop
No relevant retained door or compartment scope is identified, or the physical programme remains unverified.
The buyer cannot identify an authorised appointment or provide enough information to define and price the requested scope.
Published buyer routes
Kori Construction
Contractor: ask for project commercial or procurement lead Confirm who controls the relevant trade package, its specification and whether specialist introductions are being considered.
Review the sender details and selected recipient before sending.
Subject: The Langford: fire-door survey and package responsibilities
Hello Kori Construction team,
Cinnamon’s current page retains an end-2027 target for The Langford, with Kori appointed to the retained-facade development. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.
Does the retained-facade design create separately specified existing-to-new door or compartment interfaces, and who is responsible for them?
Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.
Kind regards,
My Fire Door
contact@myfiredoor.co.uk
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next useful trigger
A verified construction milestone, updated drawings or an operator-agreed pre-opening assessment window.