Prioritise defined door surveys and repair-or-replace decisions in Dorset, Hampshire and London. My Fire Door’s willingness to take work from individual doors to larger schemes makes small operational scopes useful alongside contractor-led packages. Wider compartmentation should be specified separately.
Dorset, Hampshire and London
Fire doorsPassive fire protection
5selected projects
AcquiredStart here
The Grange Nursing Home
Serincourt Limited trading as Numada Healthcare · Sherborne St John, Hampshire
ProgrammeConfirm current timetableSource checked28 Sept 2026Contract availabilityTo be qualified
RECOMMENDED FIRST MOVE
Use admin@numadahealthcare.co.uk (Numada Healthcare) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Can the latest door survey be used to identify a small repair scope before considering replacement or extension-related work?
Why this belongs in your brief
The Grange’s September sale announcement identifies an existing 26-bedroom home with consent for 14 additional bedrooms. My Fire Door’s stated range from individual doors to larger schemes makes a proportionate first commission possible.
TARGET SCOPE
Offer a bounded review of existing door information and any consented-extension interface, if the new owner requests it.
RELEVANT CAPABILITY
My Fire Door’s stated range from individual doors to larger schemes makes a proportionate first commission possible.
Timing and buying window
The September transaction is recent, but the 14-bedroom consent is not a construction programme. Separate existing-home support from any future extension and establish which, if either, the operator is considering.
Questions that determine whether to pursue
Tick once established; record the answer in working notes below.
Progress this opportunity
Saved in this browser. Export to share with colleagues.
Care Expansion Intelligence | Sepahi Group | Research edition 28 Sept 2026
The Grange Nursing Home · Sherborne St John
Serincourt Limited trading as Numada Healthcare | Acquired | Timetable to confirm
Target scope
Offer a bounded review of existing door information and any consented-extension interface, if the new owner requests it.
The Grange’s September sale announcement identifies an existing 26-bedroom home with consent for 14 additional bedrooms. My Fire Door’s stated range from individual doors to larger schemes makes a proportionate first commission possible.
First move
Use admin@numadahealthcare.co.uk (Numada Healthcare) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Can the latest door survey be used to identify a small repair scope before considering replacement or extension-related work?
Qualification questions
Can the latest door survey be used to identify a small repair scope before considering replacement or extension-related work?
Does the requested work concern adjustment, repair or a complete replacement assembly, and who approves that decision?
What is the next agreed review or renewal date, and is there a current need beyond the existing provider’s contract?
Subject: The Grange Nursing Home: fire-door survey and package responsibilities
Hello Numada Healthcare team,
The Grange’s September sale announcement identifies an existing 26-bedroom home with consent for 14 additional bedrooms. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.
Can the latest door survey be used to identify a small repair scope before considering replacement or extension-related work?
Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.
Kind regards,
My Fire Door
contact@myfiredoor.co.uk
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next trigger: Serincourt/Numada confirms an extension design appointment, construction programme or existing-home review.
Identify the new home’s complete doorset specification and installation responsibility through Kori.
Kori’s September announcement confirms work on Barchester’s 64-bedroom Liss home, with completion expected during 2028. The combined survey, repair and installation offer can be positioned against the actual package boundary rather than a generic door count.
First move
Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Are doorset supply, frame fitting and post-installation inspection bought together at Liss or as separate appointments?
Qualification questions
Are doorset supply, frame fitting and post-installation inspection bought together at Liss or as separate appointments?
Does the requested work concern adjustment, repair or a complete replacement assembly, and who approves that decision?
Who can appoint this particular scope, what is already committed, and what is the next decision date?
Published routes
Kori Construction | Project commercial / procurement team | works@koriconstruction.com | 01536 744402 | https://koriconstruction.com/contact/
Decision: Not reviewed | Owner: Unassigned | Next action: Not published
Selected route: Kori Construction | works@koriconstruction.com
Approach draft
Subject: Wenham Holt / Liss care home: fire-door survey and package responsibilities
Hello Kori Construction team,
Kori’s September announcement confirms work on Barchester’s 64-bedroom Liss home, with completion expected during 2028. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.
Are doorset supply, frame fitting and post-installation inspection bought together at Liss or as separate appointments?
Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.
Kind regards,
My Fire Door
contact@myfiredoor.co.uk
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next trigger: The named package or consultancy buyer confirms an onboarding window, information issue or handover appointment.
Ask the named Whitford Gardens commercial route about door-package status and any separately procured inspection role.
Kori reports work underway on Care UK’s 64-bed Whitford Gardens home in Mitcham, with a spring 2028 target. Survey capability gives a distinct question even where supply and fitting are already assigned, without assuming supplementary work exists.
First move
Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Does the Whitford Gardens door package include final inspection and documentation, and who accepts that evidence for Care UK?
Qualification questions
Does the Whitford Gardens door package include final inspection and documentation, and who accepts that evidence for Care UK?
Does the requested work concern adjustment, repair or a complete replacement assembly, and who approves that decision?
Who can appoint this particular scope, what is already committed, and what is the next decision date?
Published routes
Kori Construction | Jack Stevenson | Senior Quantity Surveyor | works@koriconstruction.com | 01536 744402 | https://koriconstruction.com/contact/
Care UK | Jake Higgins | Development Project Manager | 0330 165 1330 | https://www.careuk.com/company/contact/professional
Working context
Decision: Not reviewed | Owner: Unassigned | Next action: Not published
Selected route: Kori Construction | Jack Stevenson | works@koriconstruction.com
Approach draft
Subject: Whitford Gardens care home: fire-door survey and package responsibilities
Hello Kori Construction team,
Kori reports work underway on Care UK’s 64-bed Whitford Gardens home in Mitcham, with a spring 2028 target. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.
Does the Whitford Gardens door package include final inspection and documentation, and who accepts that evidence for Care UK?
Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.
Kind regards,
My Fire Door
contact@myfiredoor.co.uk
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next trigger: Kori or Care UK identifies a relevant appointment, information issue or operational handover decision.
Hallmark Luxury Care Homes | Construction | Late 2028
Target scope
Qualify door and adjacent-compartmentation responsibilities at Hallmark’s 110-bed Manor Road project.
Kori reports works started on Hallmark’s 110-bed Manor Road home in Redbridge, with late 2028 completion targeted. My Fire Door’s wider compartmentation offer can address interfaces if the main contractor has a defined need for that scope.
First move
Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Who coordinates the door schedule with walls, service penetrations and room-use changes during design development?
Qualification questions
Who coordinates the door schedule with walls, service penetrations and room-use changes during design development?
Does the requested work concern adjustment, repair or a complete replacement assembly, and who approves that decision?
Who can appoint this particular scope, what is already committed, and what is the next decision date?
Published routes
Kori Construction | Project commercial / procurement team | works@koriconstruction.com | 01536 744402 | https://koriconstruction.com/contact/
Hallmark Luxury Care Homes | Rob Needham | Development Director | https://www.hallmarkcarehomes.co.uk/general-enquiry/
Working context
Decision: Not reviewed | Owner: Unassigned | Next action: Not published
Selected route: Kori Construction | works@koriconstruction.com
Approach draft
Subject: Manor Road care home: fire-door survey and package responsibilities
Hello Kori Construction team,
Kori reports works started on Hallmark’s 110-bed Manor Road home in Redbridge, with late 2028 completion targeted. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.
Who coordinates the door schedule with walls, service penetrations and room-use changes during design development?
Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.
Kind regards,
My Fire Door
contact@myfiredoor.co.uk
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next trigger: A named technical buyer, defined package milestone or scheduled Hallmark operational-procurement decision.
Cinnamon Care Collection | Contractor appointed | End of 2027 completion
Target scope
Establish the current programme and any door-survey or installation role associated with the retained-facade care development.
Cinnamon’s current page retains an end-2027 target for The Langford, with Kori appointed to the retained-facade development. Survey and practical repair capability may be relevant to retained fabric, but the design team must first confirm what is actually being retained.
First move
Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Does the retained-facade design create separately specified existing-to-new door or compartment interfaces, and who is responsible for them?
Qualification questions
Does the retained-facade design create separately specified existing-to-new door or compartment interfaces, and who is responsible for them?
Does the requested work concern adjustment, repair or a complete replacement assembly, and who approves that decision?
Who can appoint this particular scope, what is already committed, and what is the next decision date?
Published routes
Kori Construction | Contractor: ask for project commercial or procurement lead | works@koriconstruction.com | 01536 744402 | https://koriconstruction.com/contact/
Cinnamon Care Collection | Head office; request development / estates team | 01784 772 770 | https://www.cinnamoncc.com/care-homes/the-langford/
Working context
Decision: Not reviewed | Owner: Unassigned | Next action: Not published
Selected route: Kori Construction | works@koriconstruction.com
Approach draft
Subject: The Langford: fire-door survey and package responsibilities
Hello Kori Construction team,
Cinnamon’s current page retains an end-2027 target for The Langford, with Kori appointed to the retained-facade development. We survey, repair and install fire doors, and undertake related compartmentation surveys and remedial work in care properties.
Does the retained-facade design create separately specified existing-to-new door or compartment interfaces, and who is responsible for them?
Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.
Kind regards,
My Fire Door
contact@myfiredoor.co.uk
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next trigger: A verified construction milestone, updated drawings or an operator-agreed pre-opening assessment window.