Qualify passive-fire packages at the service and compartment interfaces, where Ralph’s published sealing, boarding and partition capabilities are directly relevant.
Research edition: 28 September 2026. Contract availability is unconfirmed. This text view includes the published research; working notes remain in the interactive workspace on your device.
Service territory
Greater London and surrounding counties; these three matches remain in London.
Work to prioritise
London contractor scopes for penetration sealing, shaft walls, fire-rated partitions and documented compartmentation work; occupied work only against a defined scope.
Start here · Construction
Whitford Gardens care home
Care UK · Mitcham, Greater London
Programme: Spring 2028 Source checked: 2026-09-28
Target scope
Service penetration sealing and compartmentation interfaces; establish whether builders’ work, M&E penetrations and final closure are one package or split.
Why it fits
Whitford Gardens is a London new build with Kori on site and a named commercial contact. Ralph’s passive-fire scope can be routed without speculating about the door or alarm packages.
Recommended first move
Ask Kori’s published inbox to route the enquiry to Jack Stevenson or the current Whitford Gardens passive-fire package buyer. Published routing inbox: works@koriconstruction.com. This contact routes the enquiry; package award authority is not confirmed.
Timing
Spring 2028 target supports early package qualification. Confirm the actual programme and award status before estimating.
Qualification questions
Who owns sealing after each M&E trade and the final close-out inspection?
Are penetration details and compartment drawings coordinated and available to bidders?
Which installation records, product approvals and access stages are required?
Prepare before contact
Prepare a relevant penetration-sealing example and sample installation record.
List the system types and project workload Ralph can support, with current credentials ready for buyer review.
Reasons to stop
The buyer has appointed a complete passive-fire package with no open scope.
The required tested systems or documentation exceed Ralph’s demonstrable capability.
Published buyer routes
Kori Construction · Jack Stevenson
Senior Quantity Surveyor Confirm who controls the relevant trade package, its specification and whether specialist introductions are being considered.
Review the sender details and selected recipient before sending.
Subject: Whitford Gardens — passive-fire package contact
Hello Kori team,
We are Ralph Fire Protection, working on fire stopping, boarding and partitions across London. Could you route this to the commercial lead for Whitford Gardens in Mitcham?
We would like to establish who owns the service-penetration sealing and compartmentation scope, and whether that package has already been appointed. If there is a suitable route to qualify, we can send relevant project information against your specification and programme.
Kind regards,
Ralph Fire Protection Ltd
sales@ralphfire.co.uk
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next useful trigger
Named passive-fire buyer or issue of a coordinated package specification.
Hallmark Luxury Care Homes · Redbridge, Greater London
Programme: Late 2028 Source checked: 2026-09-28
Target scope
Fire-stopping and fire-rated partition/shaft-wall work where included in the buyer’s design; split off any scope retained by drylining or M&E subcontractors.
Why it fits
The 110-bedroom Manor Road development gives Ralph a larger London scheme to screen. The scale is a reason to check resources and package boundaries, not a proxy for order value.
Recommended first move
Request the Manor Road project quantity surveyor via Kori. Ask for the package list and supplier prequalification route before a technical quotation. Published routing inbox: works@koriconstruction.com. This contact routes the enquiry; package award authority is not confirmed.
Timing
Works were announced as started in September 2026 with late-2028 completion. Early commercial mapping is sensible; mobilisation dates remain unknown.
Qualification questions
Is passive fire being let centrally or within individual drylining and M&E packages?
Are shaft walls or fire-rated partitions included, and who retains design responsibility?
What prequalification and labour capacity will be required for the phased programme?
Prepare before contact
Prepare a capability sheet that clearly separates sealing, boarding and partitions.
Check prospective labour availability and the evidence required for each proposed system.
Reasons to stop
Required staffing exceeds capacity during the stated programme.
The buyer will only accept a wider drylining or M&E package that Ralph does not offer.
Published buyer routes
Kori Construction
Project commercial / procurement team Confirm who controls the relevant trade package, its specification and whether specialist introductions are being considered.
Review the sender details and selected recipient before sending.
Subject: Manor Road, Redbridge — passive-fire procurement
Hello Kori team,
Ralph Fire Protection provides fire stopping, boarding and fire-rated partition work in London. We are interested in understanding the procurement route for the Hallmark care-home development on Manor Road.
Are the penetration-sealing and partition scopes being bought separately, or through other trades? Please direct us to the relevant commercial lead and let us know whether supplier qualification is open for that scope.
Kind regards,
Ralph Fire Protection Ltd
sales@ralphfire.co.uk
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next useful trigger
Confirmed passive-fire procurement dates and scope split.
Cinnamon Care Collection · Hampton, Greater London
Programme: End of 2027 completion Source checked: 2026-09-28
Target scope
Only the passive-fire work identified by the project’s fire and compartmentation design, including any specified interfaces between retained fabric and new construction.
Why it fits
The Langford’s retained police-station facade makes the boundaries between retained and new fabric a useful design question for Ralph. No condition problem or current opening in the package is established.
Recommended first move
Ask Kori’s Langford commercial team for the current stage and passive-fire award status, then request the relevant design details if a scope remains. Published routing inbox: works@koriconstruction.com. This contact routes the enquiry; package award authority is not confirmed.
Timing
End-2027 remains the published target, but the latest physical milestone is unverified. Confirm stage before spending estimating time.
Qualification questions
What is the current stage and has the passive-fire subcontract been placed?
Which interfaces involving retained fabric are in the fire-stopping package?
Who approves the proposed details and records departures from the original design?
Prepare before contact
Prepare questions for the design responsibility matrix and interface drawings.
Identify relevant experience with retained fabric; do not claim conservation expertise unless Ralph can evidence it.
Reasons to stop
Work is already complete or fully awarded with no supplementary package.
The scope requires unsupported heritage/design responsibilities.
Published buyer routes
Kori Construction
Contractor: ask for project commercial or procurement lead Confirm who controls the relevant trade package, its specification and whether specialist introductions are being considered.
Review the sender details and selected recipient before sending.
Subject: The Langford — passive-fire scope and current programme
Hello Kori team,
We saw the plans for The Langford in Hampton, including the retained former police-station facade. Ralph Fire Protection handles fire stopping, boarding and partitions in London.
Could the project commercial lead confirm the current programme and whether the passive-fire package is already placed? If a suitable scope remains, we would like to review the specified interfaces between the retained and new work before providing capability information.
Kind regards,
Ralph Fire Protection Ltd
sales@ralphfire.co.uk
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next useful trigger
Current site milestone plus confirmation of an unplaced, defined passive-fire scope.