Lead with the door and compartmentation work Novopro has demonstrated in a Dorchester care-home refurbishment. The Grange offers a conditional existing-home and extension interface; Liss is a contractor package enquiry; Bridport needs appointment and programme confirmation before estimating begins.
Dorset, Hampshire and Wiltshire
Fire doorsPassive fire protection
3selected projects
AcquiredStart here
The Grange Nursing Home
Serincourt Limited trading as Numada Healthcare · Sherborne St John, Hampshire
ProgrammeConfirm current timetableSource checked28 Sept 2026Contract availabilityTo be qualified
RECOMMENDED FIRST MOVE
Use admin@numadahealthcare.co.uk (Numada Healthcare) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Is there an existing door survey separating repairable items from replacements, and would an extension alter any compartment boundaries?
Why this belongs in your brief
The Grange’s September sale announcement identifies an existing 26-bedroom home with consent for 14 additional bedrooms. The Dorchester refurbishment example provides a relevant care-setting reference for a phased, evidence-led repair scope.
TARGET SCOPE
Qualify a survey-led door and boarding scope at the existing home, with extension interfaces considered only if the consent is implemented.
RELEVANT CAPABILITY
The Dorchester refurbishment example provides a relevant care-setting reference for a phased, evidence-led repair scope.
Timing and buying window
The September transaction is recent, but the 14-bedroom consent is not a construction programme. Separate existing-home support from any future extension and establish which, if either, the operator is considering.
Questions that determine whether to pursue
Tick once established; record the answer in working notes below.
Progress this opportunity
Saved in this browser. Export to share with colleagues.
Care Expansion Intelligence | Sepahi Group | Research edition 28 Sept 2026
The Grange Nursing Home · Sherborne St John
Serincourt Limited trading as Numada Healthcare | Acquired | Timetable to confirm
Target scope
Qualify a survey-led door and boarding scope at the existing home, with extension interfaces considered only if the consent is implemented.
The Grange’s September sale announcement identifies an existing 26-bedroom home with consent for 14 additional bedrooms. The Dorchester refurbishment example provides a relevant care-setting reference for a phased, evidence-led repair scope.
First move
Use admin@numadahealthcare.co.uk (Numada Healthcare) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Is there an existing door survey separating repairable items from replacements, and would an extension alter any compartment boundaries?
Qualification questions
Is there an existing door survey separating repairable items from replacements, and would an extension alter any compartment boundaries?
Who specifies the complete assembly and approves records for the frame, hardware and surrounding compartment construction?
What is the next agreed review or renewal date, and is there a current need beyond the existing provider’s contract?
Subject: The Grange Nursing Home: fire-door and compartmentation scope
Hello Numada Healthcare team,
The Grange’s September sale announcement identifies an existing 26-bedroom home with consent for 14 additional bedrooms. We undertake fire-door inspection, refurbishment and installation, together with associated compartmentation work in care settings.
Is there an existing door survey separating repairable items from replacements, and would an extension alter any compartment boundaries?
Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.
Kind regards,
Novopro Fire Protection
hello@novopro.services
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next trigger: Serincourt/Numada confirms an extension design appointment, construction programme or existing-home review.
Establish the doorset and associated boarding package responsibilities at Kori’s new Liss home.
Kori’s September announcement confirms work on Barchester’s 64-bedroom Liss home, with completion expected during 2028. Novopro’s door and boarding capabilities make the assembly-to-wall boundary the most useful procurement question.
First move
Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Who buys the complete door assemblies and who is responsible for the surrounding fire-rated construction and completion records?
Qualification questions
Who buys the complete door assemblies and who is responsible for the surrounding fire-rated construction and completion records?
Who specifies the complete assembly and approves records for the frame, hardware and surrounding compartment construction?
Who can appoint this particular scope, what is already committed, and what is the next decision date?
Published routes
Kori Construction | Project commercial / procurement team | works@koriconstruction.com | 01536 744402 | https://koriconstruction.com/contact/
Decision: Not reviewed | Owner: Unassigned | Next action: Not published
Selected route: Kori Construction | works@koriconstruction.com
Approach draft
Subject: Wenham Holt / Liss care home: fire-door and compartmentation scope
Hello Kori Construction team,
Kori’s September announcement confirms work on Barchester’s 64-bedroom Liss home, with completion expected during 2028. We undertake fire-door inspection, refurbishment and installation, together with associated compartmentation work in care settings.
Who buys the complete door assemblies and who is responsible for the surrounding fire-rated construction and completion records?
Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.
Kind regards,
Novopro Fire Protection
hello@novopro.services
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next trigger: The named package or consultancy buyer confirms an onboarding window, information issue or handover appointment.
Confirm the current construction appointment and identify the 56-bed centre’s doorset buyer before discussing capability.
Dorset Council’s February update described approval for a 56-bed reablement centre and selection of Willmott Dixon subject to ratification. The Dorset care refurbishment reference is geographically relevant, while public-project onboarding requires an explicit commercial route.
First move
Use supplychainrequest@willmottdixon.co.uk (Willmott Dixon) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Has Willmott Dixon’s appointment and current programme been confirmed, and who controls fire-door procurement for the centre?
Qualification questions
Has Willmott Dixon’s appointment and current programme been confirmed, and who controls fire-door procurement for the centre?
Who specifies the complete assembly and approves records for the frame, hardware and surrounding compartment construction?
Has the conditional construction appointment been ratified, and what is the verified current programme?
Published routes
Willmott Dixon | Supply-chain team: confirm Bridport appointment and project commercial lead | supplychainrequest@willmottdixon.co.uk | https://willmottdixon.co.uk/what-we-do/how-we-work/joining-our-supply-chain
Working context
Decision: Not reviewed | Owner: Unassigned | Next action: Not published
Subject: Bridport reablement centre / former Sidney Gale House: fire-door and compartmentation scope
Hello Willmott Dixon team,
Dorset Council’s February update described approval for a 56-bed reablement centre and selection of Willmott Dixon subject to ratification. We undertake fire-door inspection, refurbishment and installation, together with associated compartmentation work in care settings.
Has Willmott Dixon’s appointment and current programme been confirmed, and who controls fire-door procurement for the centre?
Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.
Kind regards,
Novopro Fire Protection
hello@novopro.services
Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.
Next trigger: Confirmed main-contractor appointment and current programme, followed by a relevant onboarding or package milestone.