← Open interactive workspace

CARE EXPANSION INTELLIGENCE / SEPAHI GROUP

AB Fire Solutions

Use AB Fire’s engineering-strategy, systems-design and passive-survey offer to qualify a clearly bounded consultancy role. Three contractor-led projects have identifiable design teams; Pen-y-Don and Honiton are earlier-stage introductions with key appointments still unknown.

Research edition: 28 September 2026. Contract availability is unconfirmed. This text view includes the published research; working notes remain in the interactive workspace on your device.

Service territory

United Kingdom

Work to prioritise

Fire engineering strategy, systems-design consultation and passive-fire surveys, with responsibilities and deliverables agreed alongside the architect, M&E designer and operator.

Start here · Construction

Wenham Holt / Liss care home

Barchester Healthcare · Liss, Hampshire

Programme: 2028
Source checked: 2026-09-28

Target scope

Qualify a bounded design or assurance appointment alongside the existing Liss project team.

Why it fits

Kori’s September announcement confirms work on Barchester’s 64-bedroom Liss home, with completion expected during 2028. AB Fire’s strategy and systems-design consultancy can target an identified coordination task rather than compete for an installation package.

Recommended first move

Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Who owns the fire strategy and systems-design coordination between Holden & Lee, TDC and the appointed M&E team?

Timing

The September construction announcement provides a named project route and a 2028 horizon. Package and consultancy appointments may already be committed; identify the exact buyer and next decision before estimating.

Qualification questions

Prepare before contact

Reasons to stop

Published buyer routes

Kori Construction

Project commercial / procurement team
Confirm who controls the relevant trade package, its specification and whether specialist introductions are being considered.

works@koriconstruction.com

01536 744402

Verify this contact on its source
Barchester Healthcare

Head office; request property / estates procurement
Ask who controls operator standards and ongoing fire, nurse-call or maintenance support for this home.

0203 131 4636

Verify this contact on its source

Supplier introduction draft

Review the sender details and selected recipient before sending.

Subject: Wenham Holt / Liss care home: fire-strategy and design responsibilities

Hello Kori Construction team,

Kori’s September announcement confirms work on Barchester’s 64-bedroom Liss home, with completion expected during 2028. We provide fire-engineering strategy, systems-design consultation and passive-fire survey services for care and other premises.

Who owns the fire strategy and systems-design coordination between Holden & Lee, TDC and the appointed M&E team?

Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.

Kind regards,
AB Fire Solutions
info@abfs.ltd

Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.

Next useful trigger

The named package or consultancy buyer confirms an onboarding window, information issue or handover appointment.

Original evidence

Worth qualifying · Construction

Manor Road care home

Hallmark Luxury Care Homes · Redbridge, Greater London

Programme: Late 2028
Source checked: 2026-09-28

Target scope

Identify whether the 110-bed Manor Road project has a defined fire-engineering or systems-coordination requirement.

Why it fits

Kori reports works started on Hallmark’s 110-bed Manor Road home in Redbridge, with late 2028 completion targeted. The offer can be relevant to a clearly commissioned review on a larger care scheme, without assuming the design needs correction.

Recommended first move

Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Does Hallmark or Kori hold the fire-engineering appointment, and are any client-side review decisions still open?

Timing

Late 2028 is a long delivery horizon. Use the current construction route to establish responsibilities; avoid treating it as an imminent operational service order.

Qualification questions

Prepare before contact

Reasons to stop

Published buyer routes

Kori Construction

Project commercial / procurement team
Confirm who controls the relevant trade package, its specification and whether specialist introductions are being considered.

works@koriconstruction.com

01536 744402

Verify this contact on its source
Hallmark Luxury Care Homes · Rob Needham

Development Director
Route operator specification and future maintenance enquiries to Hallmark's property team.

Verify this contact on its source

Supplier introduction draft

Review the sender details and selected recipient before sending.

Subject: Manor Road care home: fire-strategy and design responsibilities

Hello Kori Construction team,

Kori reports works started on Hallmark’s 110-bed Manor Road home in Redbridge, with late 2028 completion targeted. We provide fire-engineering strategy, systems-design consultation and passive-fire survey services for care and other premises.

Does Hallmark or Kori hold the fire-engineering appointment, and are any client-side review decisions still open?

Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.

Kind regards,
AB Fire Solutions
info@abfs.ltd

Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.

Next useful trigger

A named technical buyer, defined package milestone or scheduled Hallmark operational-procurement decision.

Original evidence

Worth qualifying · Construction

Whitford Gardens care home

Care UK · Mitcham, Greater London

Programme: Spring 2028
Source checked: 2026-09-28

Target scope

Route a consultancy-scope enquiry through the named Whitford Gardens commercial team and identify the technical decision maker.

Why it fits

Kori reports work underway on Care UK’s 64-bed Whitford Gardens home in Mitcham, with a spring 2028 target. The three connected consultancy disciplines support an interface discussion if the project identifies a genuine gap in responsibility.

Recommended first move

Use works@koriconstruction.com (Kori Construction) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Who coordinates the fire strategy, alarm cause-and-effect and passive-fire evidence for Care UK’s operational handover?

Timing

The August work-start announcement and spring 2028 target justify a project-team introduction. Neither proves open packages; ask where the proposed scope sits in the existing appointment structure.

Qualification questions

Prepare before contact

Reasons to stop

Published buyer routes

Kori Construction · Jack Stevenson

Senior Quantity Surveyor
Confirm who controls the relevant trade package, its specification and whether specialist introductions are being considered.

works@koriconstruction.com

01536 744402

Verify this contact on its source
Care UK · Jake Higgins

Development Project Manager
Confirm the operator specification, handover responsibilities and future servicing buyer.

0330 165 1330

Verify this contact on its source

Supplier introduction draft

Review the sender details and selected recipient before sending.

Subject: Whitford Gardens care home: fire-strategy and design responsibilities

Hello Kori Construction team,

Kori reports work underway on Care UK’s 64-bed Whitford Gardens home in Mitcham, with a spring 2028 target. We provide fire-engineering strategy, systems-design consultation and passive-fire survey services for care and other premises.

Who coordinates the fire strategy, alarm cause-and-effect and passive-fire evidence for Care UK’s operational handover?

Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.

Kind regards,
AB Fire Solutions
info@abfs.ltd

Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.

Next useful trigger

Kori or Care UK identifies a relevant appointment, information issue or operational handover decision.

Original evidence

Monitor · Developer being sought

Pen-y-Don

Pendine Park · Wrexham, Wrexham

Programme: Around 15 months after intended 2027 construction start
Source checked: 2026-09-28

Target scope

Establish whether Pendine Park needs fire-engineering input to the developer brief before design responsibilities are fixed.

Why it fits

Pendine Park’s September announcement describes the planned 77-bed Pen-y-Don home, with a developer being sought and a 2027 start intended. The early stage is better suited to an appointment-definition discussion than later remedial work or equipment supply.

Recommended first move

Use admin@pendinepark.com (Pendine Park) to request the person responsible for the proposed scope. This is a published business route, not proof that the inbox holder can award the work. Lead with: Has the operator appointed the fire engineer who will inform the developer’s design brief and future system requirements?

Timing

The announcement says a developer is being sought and a 2027 start is intended. Planning status and trade timetable are not established; early buyer and design discovery is appropriate.

Qualification questions

Prepare before contact

Reasons to stop

Published buyer routes

Pendine Park

Central office; request Pen-y-Don development lead
Request the operator development or estates buyer; confirm handover, incumbent agreements and service-review timing.

admin@pendinepark.com

01978 720242

Verify this contact on its source

Supplier introduction draft

Review the sender details and selected recipient before sending.

Subject: Pen-y-Don: fire-strategy and design responsibilities

Hello Pendine Park team,

Pendine Park’s September announcement describes the planned 77-bed Pen-y-Don home, with a developer being sought and a 2027 start intended. We provide fire-engineering strategy, systems-design consultation and passive-fire survey services for care and other premises.

Has the operator appointed the fire engineer who will inform the developer’s design brief and future system requirements?

Could you point us to the person who owns that decision and let us know whether this is a useful time for an introduction? If the scope is already covered, knowing the appropriate review point would help us avoid duplicating existing arrangements.

Kind regards,
AB Fire Solutions
info@abfs.ltd

Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.

Next useful trigger

Developer selection, confirmed design-team appointments or an issued project brief.

Original evidence

Monitor · Planning approved

Former Mill Water School care-home development

Undisclosed national care provider · Honiton, Devon

Programme: Confirm current timetable
Source checked: 2026-09-28

Target scope

Seek introduction to the unnamed operator to clarify fire-strategy and systems-design appointments after consent.

Why it fits

The September announcement records the sale of the former Mill Water School site, with consent for a 70-bedroom care home; the buyer is unnamed. AB Fire’s national consultancy offer is geographically suitable, but commercial qualification depends on revealing the real design team.

Recommended first move

Email Sara Hartill at sara.hartill@christie.com to ask whether an introduction to the owner or project lead is possible. The adviser is not the procurement buyer. Lead with: Has the buyer selected the architect and fire-engineering adviser who will develop the consented 70-bedroom scheme?

Timing

Consent and sale are confirmed, but the operator, contractor and start date are not. This remains introduction and monitoring work; no quotation deadline or supplier appointment should be inferred.

Qualification questions

Prepare before contact

Reasons to stop

Published buyer routes

Christie & Co · Sara Hartill

Director - Care; transaction adviser
Request an introduction to the current owner or project team; the adviser is not the procurement buyer.

sara.hartill@christie.com

+44 7783 811138

Verify this contact on its source

Supplier introduction draft

Review the sender details and selected recipient before sending.

Subject: Former Mill Water School care-home development: introduction to the relevant owner or project lead

Hi Sara,

The September announcement records the sale of the former Mill Water School site, with consent for a 70-bedroom care home; the buyer is unnamed. We provide fire-engineering strategy, systems-design consultation and passive-fire survey services for care and other premises.

Would it be possible to forward a short introduction to the owner or relevant project lead? The initial question is: Has the buyer selected the architect and fire-engineering adviser who will develop the consented 70-bedroom scheme?

We would like to establish whether there is a defined requirement and the right time to speak. We appreciate that the sale announcement does not establish a current supplier review.

Kind regards,
AB Fire Solutions
info@abfs.ltd

Privacy or contact preferences: reply to this email. Please let us know if you would prefer no further contact.

Next useful trigger

A named buyer, design team or contractor, followed by an actual programme or supplier route.

Original evidence